Sturgis, SD
40 kW
EPC
​​This Solar Canopy provides a shaded rest area and green energy to a very busy site in Sturgis, SD.​
The energy collected will help offset the energy use at City Hall. And the structure has more than a 20-year lifespan and requires very little maintenance.
​
Construction Process:
About 90% of construction takes place on the ground, making construction three-times faster than traditional carport designs. After on-the-ground assembly, panel placement, inverter mounting, wiring and lighting, the canopy units are lifted by crane for final attachment, minimizing overhead work and optimizing worksite safety.